Commit graph

1 commit

Author SHA1 Message Date
veilor-org
6db4b759fa docs: test run report skeleton for v0.5.32 (Forgejo build)
Some checks failed
Lint / Kickstart syntax (pull_request) Failing after 3s
Lint / Shell scripts (pull_request) Failing after 41s
Lint / No personal/onyx leaks (pull_request) Failing after 35s
First test-runs/ report off the new template. Records the build host
(forgejo-runner on nullstone, ubuntu-24.04 / catthehacker:act-24.04),
notes that v0.5.32 is the first ISO produced after the GH Actions
mirror was disabled, and pre-populates the Findings section with the
7 v0.5.32 blocker fixes from the 2026-05-05 9-agent wave as expected
behaviours the tester must verify.

Result is left as "pending A1 build" — the operator + A5 fill in
per-step pass/fail and hardening output once the actual VM walkthrough
runs against the produced ISO. This is intentional: the report is the
scaffold; the test is a separate step.
2026-05-06 10:34:06 +01:00